Traffic and Parking signage/signal issue
Conversation Sentiment
Interaction
positive 100%
“The communication was professional and responsive with a clear plan to address the issue.”
Outcome
positive 100%
“The reported problem was resolved as indicated by the assignment of the task to Traffic - Patricia L and her confirmation that the sign would be raised to the right height and secured to the pipe post.”
3 comments analyzed
Comments (3)
Engineering - Althea assigned this issue to Traffic - Patricia L
We will have the sign raised to the right height and secured to the pipe post.
We will have the sign raised to the right height and secured to the pipe post.