24 Issues
100% Int. Positive
0% Int. Negative
58% Out. Positive
8% Out. Negative
Interaction
Outcome

Recent Comments

Suggestion · 2016-08-08 · SeeClickFix
The construction of the ramp may fall within Light Rail responsibilities. I will review with Joe D'Souza and report back to you.
Suggestion · 2016-08-08 · SeeClickFix
The construction of the ramp may fall within Light Rail responsibilities. I will review with Joe D'Souza and report back to you.
Please be advised of the following, when we receive a request for an additional traffic control device at an intersection we initiate a traffic engineering survey. This survey consists of a crash analysis, collision diagram, condition diagram and a 25 hour motor vehicle count and when warranted a “speed” or “classification” count. We also take into consideration other factors at the intersection, such as, any sight distance problems for vehicles entering the intersection. Once all the traffi…
This complaint has been forwarded to Chris Piersa, Project Manager for the Paving.
We will survey the west side of Washington St, between Columbus & Montgomery opposite the driveway to confirm the one way arrow is present. If not we will issue a work order to have it replaced.
We will survey the west side of Washington St, between Columbus & Montgomery opposite the driveway to confirm the one way arrow is present. If not we will issue a work order to have it replaced.
We will have the one way sign picked up and reinstalled
We will have the one way sign picked up and reinstalled.
Driveways · 2016-07-12 · SeeClickFix
Requests to have the driveway stenciled with "no parking" should be directed to the Parking Enforcement Division, 201.206.8933. As for the application for a reserved parking space, if there is a driveway or garage available to the disabled individual to park his/her vehicle, he/she may not be entitled to a reserved parking space.
Driveways · 2016-07-12 · SeeClickFix
Requests to have the driveway stenciled with "no parking" should be directed to the Parking Enforcement Division, 201.206.8933. As for the application for a reserved parking space, if there is a driveway or garage available to the disabled individual to park his/her vehicle, he/she may not be entitled to a reserved parking space.
Driveways · 2016-07-12 · SeeClickFix
Requests to have the driveway stenciled with "no parking" should be directed to the Parking Enforcement Division, 201.206.8933. As for the application for a reserved parking space, if there is a driveway or garage available to the disabled individual to park his/her vehicle, he/she may not be entitled to a reserved parking space.
We will survey the pavement markings along Marin Blvd and have them refurbished where needed.
We will survey the pavement markings along Marin Blvd and have them refurbished where needed.
As per the inquiry below concerning allowing a Right Turn on Red at the base of the Ramps from Rt 139 Lower and JFK Blvd at Tonnelle Circle, this would not work as the right turn movement is a double lane right turn. A double right requires a dedicated movement or vehicles would conflict with the thru traffic. As the thru traffic is coming around the bend with sight restrictions this would be problematic. The issue here is the vey complicated signal timing for the circle intersection. We wil…
We will request that the Division of Buildings and Streets have the u-post with "one way arrow" picked up and reinstalled.
We will request that the Division of Buildings and Streets have the u-post with "one way arrow" picked up and reinstalled.
Comment Traffic | Verified Official We will have any remnant of a u-post or pipe post removed in the vicinity of 487 Bergen Av and have the missing sign replaced.
We will have any remnant of a u-post or pipe post removed in the vicinity of 487 Bergen Av and have the missing sign replaced.
We will look into this complaint and report back to you
We will look into this complaint and report back to you.
Traffic | Verified Official This intersection is under the jurisdiction of the State Department of Transportation. We will forward our suggestion to that Agency for their review and recommendation
This intersection is under the jurisdiction of the State Department of Transportation. We will forward our suggestion to that Agency for their review and recommendation.
Loose Traffic Sign · 2016-07-11 · SeeClickFix
This post and sign was installed by the DOT in conjunction with the reconstruction on Route 139. We will forward the complaint to them for the necessary repairs.
Loose Traffic Sign · 2016-07-11 · SeeClickFix
This post and sign was installed by the DOT in conjunction with the reconstruction on Route 139. We will forward the complaint to them for the necessary repairs.
We will have the operation of the TS checked
We will have the operation of the TS checked.
The operation and maintenance of the traffic signals along Kennedy Blvd are under the jurisdiction of the Office of the County Engineer. We will forward this complaint to them.
The operation and maintenance of the traffic signals along Kennedy Blvd are under the jurisdiction of the Office of the County Engineer. We will forward this complaint to them.
We will have the sign picked up and reinstalled.
We will have the sign picked up and reinstalled.
The 2016 Striping Project is scheduled to be awarded at the July 13th Municipal Council meeting. Soon thereafter the striping refurbishing will begin. As for the request for a speed hump, the petition may be obtained from the Residence Response Center. They in turn will forward it to us and we will do what is necessary to determine if the speed hump is warranted.
The 2016 Striping Project is scheduled to be awarded at the July 13th Municipal Council meeting. Soon thereafter the striping refurbishing will begin. As for the request for a speed hump, the petition may be obtained from the Residence Response Center. They in turn will forward it to us and we will do what is necessary to determine if the speed hump is warranted.
We will follow up on the installation of the "stop" sign for the southeast corner of Concord @ St. Paul's Av.
We will follow up on the installation of the "stop" sign for the southeast corner of Concord @ St. Paul's Av.
We will have the sign raised to the right height and secured to the pipe post.
We will have the sign raised to the right height and secured to the pipe post.
We will check the timing for the traffic and pedestrian signals at this intersection.
We will check the timing for the traffic and pedestrian signals at this intersection.
I will forward this complaint to the Office of the County Engineer as the maintenance and operation of this traffic signal is under their jurisdiction. I will follow up with as to what is recommended in response to your complaint.
I will forward this complaint to the Office of the County Engineer as the maintenance and operation of this traffic signal is under their jurisdiction. I will follow up with as to what is recommended in response to your complaint.
We will survey the area for all missing signs and issue a work order for any replacements that are needed
We will survey the area for all missing signs and issue a work order for any replacements that are needed.
The Traffic Analyst for this area will survey the intersection and issue a work order for any missing signs.
We will report this to the Division of Buildings & Streets
The Traffic Division will notify PSE&G.

Issues (24)

Issue Type Interaction Outcome Status Date
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-12 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-11 SCF
Driveways Zoning: Driveways positive neutral Archived 2016-07-11 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive neutral Archived 2016-07-11 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-11 SCF
Traffic Pole sticking out of Sidewalk Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-11 SCF
Loose Traffic Sign Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-11 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive neutral Archived 2016-07-10 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-09 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-08 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive neutral Archived 2016-07-08 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-08 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive neutral Archived 2016-07-07 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-07 SCF
Suggestion Traffic/Pedestrian Safety Study Requests positive positive Archived 2016-07-06 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive positive Archived 2016-07-06 SCF
Service Request Not Listed Service Request Not Listed positive positive Archived 2016-07-06 SCF
Traffic Signals Changing Fast Traffic: Signal, Signage, and Striping Maintenance positive neutral Archived 2016-07-05 SCF
Traffic Calming/Pedestrian Safety request Traffic/Pedestrian Safety Study Requests positive positive Archived 2016-06-10 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive neutral Archived 2016-06-10 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive negative Archived 2016-06-09 SCF
Traffic and Parking signage/signal issue Traffic: Signal, Signage, and Striping Maintenance positive negative Archived 2016-06-09 SCF
Broken pedestrian safety sign - positive positive Archived 2016-06-03 SCF
Broken lamp post. It's ready to fall. - positive neutral Archived 2016-04-13 SCF